Construction Staking & Observation

Prescott Valley Channel and Trail Improvements, Prescott Valley, AZ., 2002-2001. This project for the Town of Prescott Valley involves replacement of 4 undersized culvert crossings of local streets, a pedestrian/drainage crossing of Robert Road, the primary north-south street through the center of town and a bridge for the multi-use trail.

Bradshaw Mountain High School East, Prescott Valley, AZ., 2001. The $11 million project included 2300 feet of interior roadway, extensive site drainage, public water and sewer line, grading, parking lot, boundary and topo survey and a SWPPP plan.

Congress Village, Congress, AZ., 2001. Design of distribution system, inspection of installation and certification of compliance with Arizona Department of Environmental Quality requirements for subdivision to use Septic/Soil Absorption individual sewage disposal system.

Santa Fe Loop Road, Prescott Valley, AZ., 2000. Design, construction staking and construction observation of a 4000 foot roadway through an industrial area for the Town of Prescott Valley. Lime stabilization of the expansive clay soils was substituted for ABC, resulting in a considerable savings to the Town.

Cliffside Trail/Pima Way Storm Water Runoff Project, Lake Montezuma, AZ., 1999. For the Yavapai County Flood Control District, supplied planning and design of 4800 lineal feet of storm sewer ranging in size from 18” through 78” in the Lake Montezuma area.