|
Ponderosa Plaza Mall, Prescott, AZ., 2002. Boundary survey, Record of Survey map with lot split.
Bradshaw Mountain High School East, Prescott Valley, AZ., 2002. All phases of construction staking, including building lay out and road stakes.
Fain Road, Prescott Valley, AZ., 2002. Construction staking on 5 miles of Fain Road realignment, also 2 miles of frontage roads and side roads, including 4 bridges, and right-of-way.
Hensley Distribution Company Building, Prescott Valley, AZ., 2002. All phases of construction staking, including building lay out, water, sewer, and utilities trenching, for the new Budweiser Distribution Center.
Prescott Valley Channel and Trail Improvements, Prescott Valley, AZ., 2002. All phases of construction staking, including box culverts, 54” pipe, and bike and walking trails.
Highway 69 Overlay, Prescott, AZ., 2002. All phases of construction staking including drainage, signal pole locations, curb and guard rail.
Perkinsville Road, Chino Valley, AZ., 2002. Construction staking for the realignment of 2 miles of Perkinsville Road, including drainage structures and Right-of-Way location.
Walmart Super Center, Prescott, AZ., 2002. Construction staking for phase I, including slope stakes, and building pad grades.
Highway 260 at Camp Verde, Camp Verde, AZ., 2002. Construction staking for the widening and realignment of 5 miles of Highway 260, to include 3 miles of frontage roads, on and off ramps at Interstate 17, 1 bridge overpass at I-17 and a new bridge at Highway 260 and the Verde River.
Black and Ponderosa Plaza Drives, Prescott, AZ., 2002. Detailed topographic survey for design of street and drainage improvements.
Big Sky Business Park Phase I and II, Prescott Valley, AZ., 2002-2001. Topographic and boundary survey with Record of Survey map.

  
Web Site Questions
Last Updated 11/06/2006
© Claycomb/Rockwell Associates, Inc. 2005
|